Skip to content

Links to Other Resources ​

Table of Contents


Linking a task to a campaign, product, or project ​

Tasks can be linked to other Sembot resources — campaigns, products, keywords, domains, or project connections. The link is displayed on the task card as contextual information (e.g., the campaign or product name), making it easy to identify which resource a given task relates to.

These links are typically set automatically by the system at the time the task is created — they are not a field in the manual task creation form.


Tasks created automatically by a workflow ​

Workflows (automations) can create tasks as a result of their execution. The workflow node responsible for creating a task can specify the properties of the new task: title, priority, assignee, and other fields. A task created this way is linked to the specific workflow run, allowing its origin to be traced.

Tasks generated by a workflow appear in the standard task list view — they look the same as manually created tasks, although their card may include information about the automation source.


Tasks created by alerts (e.g., from monitoring) ​

Sembot can automatically create tasks in response to monitoring events — for example, a campaign exceeding a threshold, errors detected in a product feed, or a change in product status. This mechanism is based on Task Triggers: each trigger defines a condition and the properties of the task to be created when that condition is met.

A task created by an alert includes contextual information on its card indicating the resource that triggered its creation (e.g., campaign name, product ID).